Wednesday, March 31, 2021

Filming Day 2

     Production continued today as we met up and filmed for our short film right after school. We originally planned to film both the coming of age and horror scenes, but ran out of time as the sun set. By the time we would have got to the location to film the horror scene, it would have been way too dark to film anything. Despite this little setback, the coming of age portion that we filmed came out way better than I could've thought. The lighting way perfect as it shined through the window of the bedroom we filmed in and made some amazing lens flares with the camera we used. 

    My partners, Ryan and Oliver, were able to secure some high quality equipment through the Student Television Network, which made the overall quality of our filming sky rocket. We had lights, light diffusers, reflectors, stabilizers, and much more. For most of the scene we used the stabilizer to add a lot of movement into the scene that added some variety to our film. The smooth movements made our filming look very professional and will surely stand out. Other than not being able to film our horror scene, the production process is moving along very well and we expect to be over on Friday. Here's a rough edit of the very beginning of the scene:



No comments:

Post a Comment